Drop boxes scheduled for pick-up must be properly prepared in order for us to load & haul the box. Any improper preparation may result in additional fees & a delay in service.
Any damage done to the box or equipment will result in repair charges. Avoid additional charges or service delays by properly loading and securing the drop box.
Customer Responsibility: The customer is solely responsible for all material placed in the drop box. Any fines, fees, or additional disposal charges resulting from prohibited or restricted materials will be the responsibility of the customer.
Asbestos Testing May Be Required
Construction, demolition, and remodel materials may require asbestos testing prior to disposal. Materials commonly requiring testing include: drywall and joint compound, floor tiles and mastic, ceiling tiles, roofing felt and shingles, pipe insulation, textured paint and plaster, and transite siding. It is the customer's responsibility to ensure materials are properly tested and cleared before placing them in the drop box. See the Oregon Metro C&D Waste Form for a full list of materials that may require testing.
Oregon Metro requires a Construction & Demolition Waste form for certain projects. Download and complete the fillable PDF before your haul.
Download C&D Waste Form (PDF)It is illegal to dispose of e-waste (electronics) in a drop box or garbage container, per DEQ electronics ban and regulations, such as:
For information on where to have electronics recycled for FREE, go to Oregon E-Cycles.
Questions? Call us today.
503.439.1303